Lucky Textile Mills Unit 4

 Lucky Textile Mills – Unit 04

Multi-Source Synchronization & SCADA System

RA Engineering designed and commissioned a highly flexible synchronization solution for Lucky Textile Mills Unit-04, enabling seamless operation across gas gensets, future HFO turbine, and K-Electric grid.

**Installed Capacity

  • 1 × CAT gas (1.2 MW)
  • 4 × Jenbacher gas (2.5 MW + 850 kW + 2 × 3 MW)
  • Future: 1 × 5 MW HFO turbine + 1 × 3 MW Jenbacher
  • K-Electric: 4.9 MW

Key Features Delivered

  • Full ComAp synchronization (genset-to-genset, mains, BTB, and future turbine modules)
  • Soft change-over (MGCB) and bus-coupler logic for 400 V & 11 kV buses
  • Five operating modes: 100% gas | 100% K.E | 100% turbine | partial gas + K.E | partial gas + turbine
  • Centralized SCADA bench with touch-screen IPC in existing control room
  • Complete single-line & control drawings, all inter-panel control cabling

Outcome Zero-blackout source switching, future-ready design for additional 8 MW capacity, and single-point monitoring of entire power plant.

Another reliable, scalable power system proudly delivered by RA Engineering.

Ready for yours? Call +92-21-34852125

Client

California Building Co

Location

Los Angeles, California

Category

Construction & Engineering

Architect

Thomas Smith Studio

Year Completed

2024