Project Highlight: Al-Karam Textile Mills
Complete ComAp Synchronization & Smart Power Management System
RA Engineering successfully delivered a turnkey synchronization and automation solution for Al-Karam Textile Mills, one of Pakistan’s largest and most advanced textile manufacturing facilities.
Project Scope & Key Supplies
- Mains Synchronization Panel with internal wiring, allied material, and integrated Bus Coupler Synchronization Module (ComAp) including battery bank
- Smart Load Shedding System designed for 3 × MTU 12V L64 Gas Gensets + 1 × Mains, featuring 22 programmable outputs across different plant locations with optical fibre and control cabling for fastest response
- CMC (Controller Master Control) Panel for MTU gas gensets complete with ComAp modules, droop kit, allied material, and dedicated battery bank
- Full SCADA System for real-time monitoring and historical trending of generation, load, and utilities
- Optional Jacket Water Recovery CHP (Combined Heat & Power) package with sensors for waste heat utilization
Key Features Delivered
- Seamless genset-to-genset and genset-to-mains paralleling with zero blackout transfer
- Intelligent 22-stage load shedding with priority-based protection of critical machinery
- Remote monitoring and control via ComAp WebSupervisor (cloud-ready)
- Automated start/stop, load sharing, and peak-lopping for maximum fuel efficiency
- All ComAp modules supplied with 2-year warranty from date of supply
Client Responsibilities (as agreed)
- Supply, laying & termination of power cables
- Provision of power panels, motorized breakers/contactors (on coil, off coil, UVT, aux contacts), busbar arrangements, CT/PT
- 220 VAC supply for battery charger
- Ensuring all generators are in proper running condition with electronic governor and droop-type AVR
- Actuator health and panel placement on site
- Final testing & commissioning on client-provided load
Project Reference
REF/RA/502/22 – Final Revised Quote accepted Delivery: 16–20 weeks Ex-Works Karachi from confirmed PO Purchase Order issued to: R.A. Engineering (Pvt.) Ltd.
Al-Karam Textile now enjoys fully automated, reliable, and fuel-efficient power with zero unplanned downtime — another landmark project proudly powered by RA Engineering.
Want the same reliability for your plant? Contact us at +92-21-34852125
Client
AL-KARAM TEXTILE
Location
Karachi, Paksitan
Category
Synchronizing +Turbine Control
Supervision
Qazi Rashid
Year Completed
2025