AL-KARAM TEXTILE

Project Highlight: Al-Karam Textile Mills

Complete ComAp Synchronization & Smart Power Management System

RA Engineering successfully delivered a turnkey synchronization and automation solution for Al-Karam Textile Mills, one of Pakistan’s largest and most advanced textile manufacturing facilities.

Project Scope & Key Supplies

  • Mains Synchronization Panel with internal wiring, allied material, and integrated Bus Coupler Synchronization Module (ComAp) including battery bank
  • Smart Load Shedding System designed for 3 × MTU 12V L64 Gas Gensets + 1 × Mains, featuring 22 programmable outputs across different plant locations with optical fibre and control cabling for fastest response
  • CMC (Controller Master Control) Panel for MTU gas gensets complete with ComAp modules, droop kit, allied material, and dedicated battery bank
  • Full SCADA System for real-time monitoring and historical trending of generation, load, and utilities
  • Optional Jacket Water Recovery CHP (Combined Heat & Power) package with sensors for waste heat utilization

Key Features Delivered

  • Seamless genset-to-genset and genset-to-mains paralleling with zero blackout transfer
  • Intelligent 22-stage load shedding with priority-based protection of critical machinery
  • Remote monitoring and control via ComAp WebSupervisor (cloud-ready)
  • Automated start/stop, load sharing, and peak-lopping for maximum fuel efficiency
  • All ComAp modules supplied with 2-year warranty from date of supply

Client Responsibilities (as agreed)

  • Supply, laying & termination of power cables
  • Provision of power panels, motorized breakers/contactors (on coil, off coil, UVT, aux contacts), busbar arrangements, CT/PT
  • 220 VAC supply for battery charger
  • Ensuring all generators are in proper running condition with electronic governor and droop-type AVR
  • Actuator health and panel placement on site
  • Final testing & commissioning on client-provided load

Project Reference

REF/RA/502/22 – Final Revised Quote accepted Delivery: 16–20 weeks Ex-Works Karachi from confirmed PO Purchase Order issued to: R.A. Engineering (Pvt.) Ltd.

Al-Karam Textile now enjoys fully automated, reliable, and fuel-efficient power with zero unplanned downtime — another landmark project proudly powered by RA Engineering.

Want the same reliability for your plant? Contact us at +92-21-34852125

Client

AL-KARAM TEXTILE

Location

Karachi, Paksitan

Category

Synchronizing +Turbine Control

Supervision

Qazi Rashid

Year Completed

2025